List of performances
(period 2009 - 1998)

RETE FERROVIARIA ITALIANA S.p.A.

Operative Sector of Genova

Piazza Acquaverde, 5

16126 GENOVA

J.V.: Valditerra S.p.A (Group Leader), G.C.F. S.p.A., AR.FER S.r.l., C.L.F. S.p.A. (Parts).

Object: Superstructure systematic maintenance works in the three years 2009-2011, included works for supplementary maintenance and modifications of superstructure locations inside the jurisdictional lines of the Territorial Unit of Genova Lines and of the Territorial Unit of Genova District in the Compartmental and Infrastructural Direction of Genova.

Award Amount:  € 8.609.539,77

Period of execution: 2009-2011

 

 

 

METRO S.p.A.

Via Tiburtina, 770

00159 Roma

J.V.: SALCEF S.p.A. (Group Leader), C.L.F. S.p.A. (Part).

Object: Superstructure ordinary and extraordinary maintenance works in the railway section Castelnuovo –Viterbo of the Regional railroad RM-VT.

Award Amount: € 2.857.533,68

Period of execution: 2009-2012

 

 

 

METRO C S.p.A.

Via Torre Spaccata, 172

00169 Roma

Object: Placing on the ballast of superstructure work for the section granite depot T7, and T6A and on the section T6A, T5 and T4.

Award Amount: € 9.170.325,20

Period of execution: 2009-2012

 

 

 

RETE FERROVIARIA ITALIANA S.p.A.

Via Matteotti, 5

40129 Bologna

Object: Construction of the bridge on the Po River and static testing.

Award Amount: € 61.546,54

Period of execution: 2009

 

 

 

 

 

RETE FERROVIARIA ITALIANA S.p.A.

Piazzetta Cairoli, 5

90133 Palermo

Object: putting on hand of two special trains and the relative staff for the load tests on some structure of the new double track railway section Pace del Mela-Rometta of the line Palermo-Messina.

Award Amount: € 375.907,98

Period of execution: 2009

 

 

ITALFERR S.p.A.

Via Marsala 53/67

00185 ROMA

A.T.I.: C.L.F. S.p.A. (Group Leader) – S.I.F.EL. S.p.A. (Part)

Object: Superstructure works, electric traction of new tunnels under the Bologna District of the High Speed Station and of the section between the High Speed Station and the km. 4+000 of the high speed line Bologna-Milano, and the High Speed interconnection with the line BO-VR and BO-PD for the demolition of the bridge that connects the San Ruffillo Station and the fan of sidings of the adjacent worksite of Via Corelli in Bologna.

Award Amount: € 19.043.398,85

Period of execution: 2010-2012

 

 

 

 

ITALFERR S.p.A.

Via Marsala 53/67

00185 ROMA

Participation: Stable Consortium Eureca

Object: Activities of infrastructural track reinforcement of Genova Voltri – Genova Brignole in the railways district of Genova.

Award Amount: € 272.871.948,08  

Period of execution: 2010-2016

 

 

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management – Legal Milano

Via Breda, 28

20125 MILANO

J.V.: GEFER S.p.A. (Group Leader), C.L.F. S.p.A., Valsecchi S.r.l., Acmer S.r.l. (Parts)

Object: Superstructure railways maintenance works during the years 2009-2010-2011 on the RFI Line within the territorial production direction of Milano, and works for supplementary maintenance or modifications of superstructure locations included supply of sleepers, little materials and ballast.

Award Amount: € 21.397.000,00

Period of execution: 2009-2011

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management

O.S. Bologna Legal – Head office of Florence

Piazza Adua 1 (station side)

50100 FLORENCE

J.V.: GCF S.p.A. (Group Leader), Scala Virgilio & Figli S.p.A. and C.L.F. S.p.A. (Parts).

Object: works of superstructure systematic maintenance in the years 2009, 2010 and 2011 on the RFI lines in the Compartmental and Infrastructural Direction of Florence.

Award Amount € 19.751.100,00

Period of execution: 2009-2011

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management - Legal Milan

O.S. of Torino

Via Sacchi, 1

10125 TORINO

J.V.: AR.FER S.r.l. (Group Leader), C.L.F. S.p.A. – Valditerra Lavori Ferroviri S.p.A. (Parts).

Object: works of superstructure systematic maintenance with mechanical means and point switch of the lines and locations of Territorial and Infrastructural Units North-East Lines, Centre-South Lines and Torino District for the years 2009/2010.

Award Amount € 13.930.621,20

Period of execution: 2009-2010

 

ASTALDI S.p.A.

Bulgarian Branch

67B, Tzanko Tzerkovsky

1421 Sofia - Bulgaria

Object: Subcontract for track construction in the line Parvomai–Svilengrad – Turkish border and Greek border.

Period of execution: 2009/2011

 

ASTALDI S.p.A.

Via G. V. Bona, 65

00161 ROME

Object: Subcontract for executive engineering and connected works to the doubling of the railway line Parma – La Spezia in the section between Solignano’s station and the shunting frame of Osteriazza.

Award Amount € 2.897.954,21

Period of execution: 2009/2015

 

RETE FERROVIARIA ITALIANA S.p.A.

Piazza della Croce Rossa, 1

00161 ROME

J.V.: GCF S.p.A. (Group Leader), – AR.FER S.r.l. - C.L.F. S.p.A., Valditerra Lavori Ferroviari S.p.A., GEFER S.p.A., Margaritelli S.p.A., Impresa Pizzarotti & C. S.p.A., IPA PRECAST S.p.A. (Parts).

Object: Realization of a plan of special maintenance works consisting on superstructure renewal works to made on parts of RFI line and possible civil works preliminary to the superstructure .

NORTH LOT - A

Award Amount € 148.437.224,00

Period of execution: 2009/2011

 

RETE FERROVIARIA ITALIANA S.p.A.

Piazza della Croce Rossa, 1

00161 ROME

J.V.: SALCEF S.p.A. (Group Leader), – C.L.F. S.p.A., Valditerra Lavori Ferroviari S.p.A., Lodovichi Domenico S.p.A., IPA PRECAST S.p.A., COOPSETTE Scarl (Parts).

Object: Realization of a plan of special maintenance works consisting on superstructure renewal works to made on parts of RFI line and possible civil works preliminary to the superstructure .

CENTRE LOT - B

Award Amount € 126.871.346,00

Period of execution: 2009/2011

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management - Legal Milan

O.S. of Torino

Via Sacchi, 1

10125 TORINO

J.V.: C.L.F. S.p.A. (Group Leader), – Euro Ferroviaria S.r.l. and GEFER S.p.A. (Parts).

Object: Superstructure systematic maintenance works on the jurisdictional lines of Infrastructure Management Department of Bologna.

Award Amount € 17.680.000,00

Period of execution: 2009/2010

 

TRANFIR Società Consortile a r.l.

Via Carlo Pisacane, 2

41012 CARPI (MO)

Object: Subcontract for the realization of first street railway line Florence S. M. Novella – Scandicci.

Award Amount € 3.753.000,00

Period of execution: 2007/2009

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management - Legal Milan

O.S. of Torino

Via Sacchi, 1

10125 TORINO

J.V.: AR.FER S.r.l. (Group Leader), C.L.F. S.p.A. – Valditerra Lavori Ferroviri S.p.A. (Parts).

Object: works of superstructure systematic maintenance with mechanical means and point switch of the lines and locations of Territorial and Infrastructural Units North-East Lines, Centre-South Lines and Torino District for the years 2007/2008, included works for supplementary maintenance and/or modifications of superstructure locations inside the jurisdictional lines of the same Units, included supply and transportation of prestressed-concrete and timber sleepers, timber for points switch or spans, tiny materials for Pandrol, CK1, Wassloch couplings, ballast of first category from right rocks.

Award Amount € 9.922.127,00

Period of execution: 2007-2008

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management - Legal Milan

O.S. of Torino

Via Sacchi, 1

10125 TORINO

Object: executive engineering and execution of construction works of connections between the historic lines Torino-Milan, Milan-Varese/Domodossola and high capacity line Torino-Milan around the new station of Milan Fair and the final interconnection of high capacity line and overall development plan Milano Certosa.

Award Amount € 1.213.421,44

Period of execution: 04-2008/2009

 

RETE FERROVIARIA ITALIANA S.p.A.

O.S. Legal of Rome

Administrative and Contracts – Napoli

Corso Novara, 10

80142 NAPOLI

Object: performance for the disposal of two special train for the realization of load tests on some structures of new high speed – high capacity (AV/AC) interconnection Napoli-Salerno.

Period of execution: 2008-31/03/2009

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management
Legal Milan

O.S. of Torino

Via Sacchi, 1

10125 TORINO

J.V.: C.L.F. S.p.A. (Group Leader) – AR.FER S.r.l. (Part)

Object: necessary works for superstructure interventions and lowering of the track bed of singles down and up track section of Torino-Modane line, between the stations of Collegno and Salbertrand, for allow the adaptation of GB1 gauge, adaptation of T.E. line and existent canalizations.

Award Amount € 7.345.992,03

Period of execution: 09/2007-2010

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management

Via Breda, 28

20126  Milano

J.V.: GEFER S.p.A. (Group Leader) – SEAP S.p.A., C.L.F. S.p.A., VALSECCHI S.r.l. (Part)

Object: maintenance of the superstructure on R.F.I. line, Infrastructure Management Department of Milano.

Award Amount € 13.110.420,00

Period of execution: 2007/2009

 

RETE FERROVIARIA ITALIANA S.p.A.

Via Matteotti, 5

40129 Bologna

J.V.: C.L.F. S.p.A. (Group Leader) – EURO FERROVIARIA S.r.l. – GEFER S.p.A. (Part)

Object: maintenance of the superstructure on the Bologna’s DCI jurisdiction’s lines.

Award amount € 12.034.880,00

Period of execution:  2007/2008

 

IMPRESA BENTINI S.p.A.

Via Giuseppe Verdi n. 20

48018 Faenza (RA)

J.V.: C.L.F. S.p.A. (Group Leader) – S.I.F.E.L. S.p.A. – CO.RAC.FER. S.r.l. (Part).                                                                               

Object: subcontract concerning superstructure and service’s works at laying

support’s works of the railway line, stations Mazzini, Pian di Macina, Bargellino, Caselle.

Award amount € 1.800.515,26

Period of execution: 2007/2008

 

A.T.C. S.p.A.

Via Saliceto n. 3

40128 Bologna

Object:  works of renewal by cleaning of a rail stretch for total development about ml. 400, railway Bologna – Vignola.

Award amount € 156.150,00                      

Period of execution: 2006/2007

 

Rete Ferroviaria Italiana S.p.A.

Piazza Acquaverde n. 5

16126 Genova

Object: contract for realization of a superstructure work’s programme on the railway yards of D.C.I. R.F.I. Genova’s Compartment.

Award amount € 672.500,60

Period of execution: 2006/2007

 

FERROVIENORD S.p.A.

Piazzale Cadorna n. 14/16

20123 Milano

J.V.: AR.FER. S.r.l. (Group Leader) – C.L.F. S.p.A. (Part)

Object: works for renewal of the superstructure in the Sale Marasino – Pisogne stretch.

Award amount € 3.991.773,45

Period of execution: 2007/2008

 

Rete Ferroviaria Italiana S.p.A.

Piazza Acquaverde n. 5

16126 Genova

J.V.: Valditerra Lavori Ferroviari S.p.A. (Group Leader) – C.L.F. S.p.A. (Part)

Object: biennial contract for execution of superstructure systematic maintenance’s works on the jurisdiction’s lines of Genova Lines Territorial Unit and Genova Junction Territorial Unit.

Award amount € 5.804.500,00

Period of execution: 2006

 

AZIENDA CONSORZIALE TRASPORTI – A.C.T.

Viale Trento Trieste n. 11

42100 Reggio Emilia

Object: realization of a renewal of the rails plane inside the A.C.T. railway’s depot.

Award amount € 512.487,90

Period of execution: 2006/2007

 

Società passante Torino S.P.T. Scrl

Via G.V. Bona n. 65

ROMA

J.V.: C.L.F. S.p.A. (Group Leader)– AR.FER S.r.l. (Part)

Object: subcontract concerning building works, alteration and adaptation of rails that forms temporary diversion of Torino-Milano’s line; demolition of installations railway superstructure and completion and extension of railway between Corso Vittorio Emanuele II and Corso Grosseto.

Award amount € 1.446.155,11

Period of execution: 2006/2007

 

ATCM S.p.A.

Strada Sant'Anna 210

41100 Modena

Object: restricted procedure for the formation of a contract for the rehabilitation of the railway line Modena-Sassuolo consisting in whole renewing of track and in secondary works on site and to station plans , with elaboration of detailed project of a bridge with length of m  2,50 and consolidation of about 200 m of embankment.

Award amount € 8.342.519,00

Period of execution:2005/2006

 

Cooperativa Muratori  Cementisti

Via Trieste 76

48100 Ravenna

Object: subcontract for new railway stop  Rho-Pero. Superstructure and electric traction works, signalling and lines communication.

Award amount € 3.550.000,00

Period of execution:2005/2006

 

Rete Ferroviaria Italiana S.p.A.

Piazza della Croce Rossa 1

00161 Roma

Object:  realization of a works superstructure railway maintenance program on  RFI lines in the period 2005/2006.

J.V.: Salcef S.p.A. (Group leader) - C.L.F. S.p.A., Valditerra S.p.A., Gefer S.p.A., Coopsette Soc. Coop, Lodovichi Domenico S.p.A., Ipa Precast S.p.A.(Parts) 

Award amount € 103.745.769,96

Period of execution:2005/2006

 

ALSTOM FERROVIARIA S.p.A.

Via di Corticella, 75

40128 Bologna

Object: subcontract for insertion of joints in Faenza’s station.

Award amount € 60.000,00

Period of realization: 2005

 

Met.Ro.

Metropolitana di Roma S.p.A.

Via Tiburtina 770

00159 ROMA  

Object: mixed contract of works and services for ordinary and extraordinary superstructure maintenance on the concession railway Roma-Viterbo, section  P.le Flaminio-Castelnuovo, with services of track whetting and taking away of weeds.

J.V.: SEAP Costruzioni Generali S.p.A (Group leader) -  C.L.F. S.p.A. and Mecno Service S.r.l. (Parts); 

Award amount € 3.854.526,80

Period of execution: 2005/2008

 

Rete Ferroviaria Italiana S.p.A.

Legal Management - Legal Milan

Operative Department of Turin

Via Sacchi 1

10125 Torino

Object: systematic superstructure maintenance works with mechanical means of tracks and turnouts of line and plants under jurisdiction of Infrastructure Territorial Units North-East lines, Central-South lines and  Turin Nodo lines to be done during 2005/2006 with small extraordinary maintenance works and small works for the modification of superstructure plants on lines under jurisdiction of the same units, with supply and transport of  prestressed-concrete sleepers kind FS V 35P and/or RFI 240V, wooden sleepers and turnout woods, small materials for Pandrol fastening and/or CK1 ordered and detail exposed each time with proper "Works Specification".

J.V.: C.L.F. S.p.A. (Group leader) - Ar.Fer. S.r.l. - Valditerra Lavori Ferroviari S.p.A. (Parts) 

Award amount €  7.195.650,00

Period of execution: 2005/2006

 

San Genesio Immobiliare S.p.A.

Piazza Grifoni 12

56027 San Miniato (PI)

Object: superstructure works for the realization of a railway joint into the station of  S.Romano, made of: building of  ml 3000 of track with ballast kind "B" with rails kind 50 UNI used and prestressed-concrete used sleepers; building of 4 turnouts kind 50 UNI /0,12; put in work of a turnout 60/UNI/250/0.12 on running right track into the station of S.Romano in communication with turnout kind 60/UNI/170/0.12; supply and put in work of two metal buffers; supply, transport and download of ballast of 2nd category for about mc 4000; supply, transport and download of wastes to form little streets for about mc. 300; execution of rails cuttings and put in work of glued insulated joints ;execution of all ending works also made alone, that in the opinion of working management will be necessary during the execution of  the contract .

Award amount € 895.557,00

Period of execution: 2005/2006

 

ITALFERR S.p.A.

Via Marsala, 53/67

00185 ROMA

Object: realization of new iron plan regulation, TE adequation made of the realization of new electrification plans civil works,  walking sides  in the stations of  Mirandola Ozzano, P.C.of Varignana, Castel S.Pietro, Imola and Castelbolognese of the line Bologna-Rimini.

J.V.: C.L.F. SpA (Group leader) – S.I.F.EL S.p.A., CEA Scrl  (Parts)

Award amount € 13.523.368,88

Period of execution: 2005/2008

 

RETE FERROVIARIA ITALIANA S.p.A.

Piazza Adua, 1 (station side)

50123 FIRENZE

Object: works for systematic  maintenance in years 2004, 2005 and 2006 on lines of  R.F.I. SpA for Department Infrastructure Management  of Firenze.

J.V. : Consorzio Manutenzioni Ferroviarie (Group leader) – C.L.F. S.p.A. (Part).

Award amount € 5.971.800,00

Period of execution: 2004/2006

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management

Milano Legal

Via Breda, 28

20126 MILANO

Object: Modify to the superstructure to put in right tracks for the stations of Lierna, Mandello L., Bellano T.T., Dervio, Ardenno, Ponte in V., Tresenda A.T. and Tirano of railway lines Lecco-Colico-Sondrio.

J.V. : C.L.F. SpA (Group leader) – Valsecchi Armamento Ferroviario Srl (Part)

Award amount € 2.042.374,00

Period of execution: 2004/2005

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management

Legale Milano

Via Breda, 28

20126 MILANO

Object: Realization of the new overall development plan in the station of Calolziocorte.

Award amount € 4.224.313,97

Period of execution: 2004/2006

 

ATCM SpA

Strada Sant’Anna, 210

41100 MODENA

Object: Extraordinary maintenance for cleaning and renewal  of superstructure on railway section  Modena-Sassuolo between km. 7+394 and km. 9+559.

Award amount € 1.095.531,00

Period of execution: 2004

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management

Bologna Legal

Via Matteotti, 5

40129 BOLOGNA

Object: Superstructure systematic maintenance works on lines under jurisdiction of  D.C.I. of Bologna.

Award amount € 5.982.692,40

Period of execution: 2004/2005

 

RETE FERROVIARIA ITALIANA S.p.A.

Direzione Legale

Legal Milano

Operating Department of  Torino

Via Sacchi, 1

10125 TORINO

Oggetto:  Superstructure systematic maintenance works on  North-East lines

J.V.: C.L.F. SpA (Group leader) – AR.FER S.r.l. (Part)

Award amount € 3.037.338,17

Period of execution: 2004/2005

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management

North West Legal

Via Breda, 28

20126 MILANO

Object: Right and left track renewals for section of about  ml. 800 from the railway central station of  Milano in direction of Rho, Chiasso, Bologna, Genova, Milano.

Award amount € 1.459.954,88

Period of execution: 2004/2005

 

 ASTALDI S.p.A.

Via Zago, 2

40128 BOLOGNA

Object: Subcontract for demolition and reconstruction of tracks in High Velocity Bologna railway central station.

Award amount € 1.800.000,00

Period of execution: 2004/2005

 

Rete Ferroviaria Italiana S.p.A.
Direzione Legale, Via Matteotti,5

Bologna
Object: project, building and modification of railway plants with train running, to interconnect the historical line Bologna-Milano and the corresponding section of the line high speed – high capacity (AV/AC) to be made.
J.V.: Alstom Ferroviaria S.p.A. (Group leader) Alstom Transport System S.p.A., Sirti S.p.A., C.L.F. S.p.A., Ceprini Costruzioni S.r.l., Cefs S.r.l. (Parts)
Award amount € 64.978.900,51
Period of execution: 2003/2008

COOPSETTE Scarl
Via S.Biagio, 75
Castelnovo Sotto RE
Object: Subcontract for superstructure works to be made for the contract “Realization of a central static apparatus in the railway station of  Civitavecchia and equalizing works of iron  plan with  L.d.C., light plants and  F.M., TT plants, with civil different works”.
Award amount € 1.377.932,83.
Period of execution: 2003/2004

ITALFERR S.P.A.
U.O. APPALTI
Via Marsala, 53/67
00185 ROMA
J.V.: Salcef S.p.A. (Group leader), C.L.F. S.p.A. and AR.FER S.r.l. (Parts)
Object: execution of superstructure plants on the new railway section with double track S.Stefano-Aulla-Chiesaccia of the railway line Parma-La Spezia between the station of  S.Stefano Magra and the crossroad “Chiesaccia” with new station of Aulla.
Award amount € 9.458.682,76 
Period of execution: 2003/2005

RETE FERROVIARIA ITALIANA S.P.A.
Legal Management  - Legal Bologna
Sede di Firenze
Piazza Adua, 1
50123 FIRENZE
J.V.: C.L.F. S.p.A.(Group leader) – NE.ON S.r.l.(Part)
Object: superstructure works for right track renewing works of tunnel "Borgallo”  and its consolidation in the section  between km. 65+180 and 65+400 of the railway line Parma-Vezzano Ligure. Also realisation of the new goods deposit track in the railway station of  Pisa S.Rossore, new PRF in the stations of S.Giuliano and Rigoli of the railway line Lucca-Pisa C.  and Altopascio and Pescia of the railway line  Viareggio-Firenze and realization of the 3° track between La Spezia Migliarina and Vezzano Ligure.
Award amount € 7.796.028,40
Period of execution: 2003/2006

RETE FERROVIARIA ITALIANA S.p.A.
Piazza della Croce Rossa, 1
00144 ROMA
J.V.: C.L.F. S.p.A. (Group leader)– Salcef, Gefer, Edile Ferroviaria, Valditerra, Lodovichi, Margaritelli, Ipa Precast (Parts)
Object: Maintenance works program on railway lines of  R.F.I. network – North-central section .
Award amount € 67.000.773,84
Period of execution: 2003/2005

RETE FERROVIARIA ITALIANA S.p.A.
Direzione Legale – Legale Bologna
Via Matteotti, 5
40129 BOLOGNA
J.V.: GEFER SpA (Group leader) –C.L.F. SpA, SALCEF S.p.A.(Parts)
Object: Superstructure systematic maintenance works in the period between  01 /04/2003 and 31/12/2004 on  railway lines under jurisdiction of Infrastructure Management Department of Bologna.
Award amount € 1.791.360,00
Period of execution: 2003/2004

UNIECO SCARL
Via Brigata Reggio, 24/1
42100 REGGIO EMILIA
Object: subcontract for raising the railway plant on the stream  Crostolo, near the railway station of Guastalla of the line Parma-Suzzara, with railway works.
Award amount € 560.000,00
Period of execution: 2003/2004

RETE FERROVIARIA ITALIANA S.p.A.
Zona Territoriale Adriatica
S.O. Legale di Bari
Piazza Cavour, 23
60121 ANCONA
J.V: Edile Ferroviaria SpA (Group leader) –C.L.F. SpA, SALCEF S.p.A. AR.FER Srl (Parts)
Object:  M.S.A. works on  railway lines under jurisdiction of Infrastructure Management Department – Efficiency maintenance of Ancona.
Award amount € 10.979.540,00
Period of execution:  2003/2006

ITALFERR S.p.A.
U.O. APPALTI
Via Marsala 53/67
00185 ROMA
J.V.: SCALA VIRGILIO & F. SpA (Group leader) –C.L.F. SpA, COOPSETTE Scarl, CIET SpA (Parts)
Object: works execution for equipping (A.TE. LFM and plants) to realise the service platform between tracks  1 and 2 in the railway station of Firenze Rifredi.
Award amount € 2.908.018,28
Period of execution: 2003/2004

HRVATSKE ZELJEZNICE
Branimirova 27
10001 ZAGABRIA – CROAZIA
Object: renewal works on the railway section country frontier – Metkovic – Ploce from km. 170+411,87 to km. 193+162,06.
Award amount €  6.674.350,45
Period of execution: 2003/2005

S.T.A. – Strutture Trasporto Alto Adige S.p.A.
Via Conciapelli, 60
39100 BOLZANO
Object: ballast supply for the railway line Merano-Malles.
Award amount € 1.701.000,00
Period of execution: 2003/2004

Rete Ferroviaria Italiana S.p.A.

Legal Management North - West

Piazza S.Freud 1

20154 Milano

J.V.: C.L.F. S.p.A (Group leader) AR.FER. S.r.l. (part)

Object: Superstructure systematic maintenance  in the period between 1/1/2003 and 31/12/2005 for the lines in the south of the D.C.I. of Milano.

Award amount € 3.780.563,00

Period of execution: 2003/2005

 

Rete Ferroviaria Italiana S.p.A.

North-West Territorial Area

Via Sacchi 1

10125 Torino

J.V.: CLF S.p.A. (Group leader), AR.FER. S.r.l., SALCEF S.p.A., PASOLINI VCB S:r.l., GEFER S.r.l. R.T.S. S.A. and VALDITERRA S.p.A. (Parts)

Object: Works for adaptation to the shape B1 of tunnels of the section between the station Salbertrand  and  the borderline, for the line Torino-Modane. Realization of the automatic block BAB c.c 3/3 between the station of Bardonecchia  and the borderline. adaptation of the Italian section of Frejus Tunnel with security laws.

Award amount€ 48.314.789,00

Period of execution: 2003/2006

 

Rete Ferroviaria Italiana S.p.A.

North-West Territorial area

Via Sacchi 1

10125 Torino

J.V.: CLF S.p.A. (Group leader), Ar.Fer S.r.l., S.I.F.EL. S.r.l., SALCEF S.p.A, GEMMO IMPIANTI S.p.A. (Parts)

Object: Works for building of a Terminal for goods in the station of Torino Orbassano  for loading and uploading of  heavy means on wagons with lowering plan with the realization of the place for the installation of technology for  the plant. Electric, signalling, security and light works.

Award amount € 5.279.780,30

Period of execution: 2002/2003

 

S.T.A.  Strutture Trasporto Alto Adige S.p.A.

Via Conciapelli 60

39100 Bolzano

J.V.: CLF S.p.A. (Group leader), Ing. De Aloe Costruzioni S.r.l. (Part)

Object: Superstructure works "Venosta 04" - Railway line Merano-Malles

Award amount € 15.384.472,70

Period of execution: 2002/2003

 

Rete Ferroviaria Italiana S.p.A.

North-West Territorial Area Legal S.O.

P. zza Acquaverde, 5

16126 GENOVA

J.V.: Valditerra (Group leader) - CLF S.p.A.  (part)

Object: works for systematic maintenance superstructure in the period between 2002 and 31/12/2005  on lines and plants under jurisdiction of the Territorial Unit of Managing Infrastructure Department of  Genova.

Award amount € 3.606.630,27

Period of execution: 2002/2005

 

Ferrovia Centrale Umbra S.r.l.

Largo Cacciatori delle Alpi 8

06021 PERUGIA

J.V.: VCB Srl Vecchia Cooperativa Braccianti (Group leader) - CLF S.p.A. (Part)

Object: levelling of 140.000 linear meters of track  on the line and in the station, in the levelling of 80 turnouts  and in the rent of 10 wagons  to be done in three years.

Award amount € 717.600,00

Period of execution: 2002/2004

 

Rete Ferroviaria Italiana S.p.A.

Legal Operating department of Torino

Via Sacchi 3

10125 TORINO

J.V.: C.L.F. S.p.A. (Group leader), AR.FER. Srl (part)

Object: works for superstructure systematic maintenance  with mechanical means of tracks and turnouts on lines and plants under jurisdiction of Territory Lines Unit Torino Nodo  and North- East from 2002 to 2004, with ballast rebuilding in some section of the running track  for the lines Torino-Modane, Chiasso - Casale, Novara-Biella, and Alessandria-Arona; lines Vignale-Domodossola and Chiasso Aosta  in the stations To P.N. and To S.to. Superstructure works for the ACEI plant  in the station Valenza with supply and transport of wooden sleepers and wood for turnouts, cap sleepers kind FS V 35P with first level fastening, small material for Pandrol fastening and or CK 1.

Award amount € 4.529.145,96

Period of execution: 2002/2004

 

Rete Ferroviaria Italiana S.p.A.

Territorial Area Legal Central-North

P.zza Adua 1 (Railway station side)

50123  FIRENZE

J.V.: Scala Virgilio  & F. S.p.A. (Group leader), C.L.F. S.p.A. - G.C.F. S.p.A: (Parts)

Object: execution with railway work  of works and supplies for the superstructure systematic maintenance on lines under jurisdiction of Management Department of Firenze for the period 2002 - 2004.

Award amount € 4.626.283,17

Period of execution: 2002/2004

 

A.C.T. - Azienda Consorziale Trasporti

Viale Trento Trieste 11

42100 Reggio Emilia

Object: Levelling of tracks and turnouts on the railway of Reggio Emilia

Award amount € 194.620,00

Period of execution: 2002

 

ATC S.p.A. - Azienda Consorziale Trasporti

Via Saliceto 3

40128 Bologna

Object: superstructure renewal FCV with ballast cleaning on the railway Casalecchio-Vignola between Crespellano and Bazzano  with works for the bridge  on the Samoggia river.

Award amount € 1.655.195,85 

Period of execution: 2002

 

Rete Ferroviaria Italiana S.p.A.

Legal North-Central Area

P. zza Adua 1 (Station side)

50123 Firenze

J.V.: C.E.M.E.S. S.p.A. (Group leader) - CLF (part)

Object: civil works, superstructure and T.E. for the third independent track between Pisa Centrale and Pisa S.Rossore

Award amount € 5.797.651,80 

Period of execution:  2002/2003

 

Rete Ferroviaria Italiana S.p.A.

Legal North-Central Area

Via Matteotti n.5

40129 Bologna

J.V.: CLF (Group leader), Impresa Pasolini and G.C.F. S.p.A. (Parts)

Object: execution with train running, of works and supply for systematic maintenance to the superstructure, in the period  between 01/01/2002 and 31/12/2003 on the lines under jurisdiction of Department Infrastructure Management of Bologna.

Award amount € 4.625.801,15

Period of execution:  2002/2003

 

A.T.M. Azienda Torinese Mobilità S.p.A.

Corso Turati 19/6

10128 Torino

J.V.: CLF (Group leader), M. SEAP Srl, - AR.Fer. Srl - Campra Geom. C. & F. S.p.A. - Smaldone Costruzioni Srl (Parts)

Object: Works for adaptation and renewal to the  tramway superstructure  for the year 2002.

Award amount € 1.891.523,40

Period of execution: 2002/2003

 

A.T.I.: Consorzio Cooperative Costruzioni

Via della Cooperazione n. 30, 

40129 Bologna

Object: Subcontract for earth works for the belt line Milano-Bologna near the Airport.

Award amount € 5.343.987,76

Period of execution: 2002/2004

 

UNIECO

Object: Works for the superstructure  for A.V. on the line Milano Bologna.

Award amount  € 70.964.765,39

Period of execution: 2003/2008

 

MET.RO. S.p.A.

Via Volturno 65

00198 ROMA

J.V.: SEAP S.r.l. (Group leader), C.L.F. S.p.A. (part)

Object: Works for three years for ordinary and extraordinary maintenance to the superstructure of Piazzale di Osteria of Curato, in the underground of Roma line "A". 

Award amount € 1.675.717,00

Period of execution: 2002/2003

 

Ferrovie dello Stato S.p.A.

Infrastructural department 

Territorial area North-Central Legal/Contracts

P.zza Unità Italiana 1

50123 Firenze

J.V.: CLF SpA (Group leader), Impresa PASOLINI S.r.l., MI. COS. S.r.l.(Parts)

Object: Works for track renewing in Tunnel Borgallo with lowering of the platform plan, works for the draining structure, signalling and telephone works for trains running with charging profile P.C. 45 line Parma-Vezzano-Ligure.

Award amount € 7.955.973 

Period of execution: 2001/2003

 

ATCM S.p.A.

Strada S.Anna 210

41100 Modena

J.V.: CLF S.p.A. (Group leader), Impresa Raccordi Ferroviari Bonaventura Luigi S.r.l.(Part)

Object: contract for the extraordinary maintenance of the track railway Modena-Sassuolo with replacing of 11000 sleepers given by CLF levelling 16000 linear meters  of track, regulation of dilatation for 16000 linear meters of track, ballast profiling and put in work of 6 level crossing.

Award amount € 738.534

Period of execution: 2001

 

Ferrovie dello Stato S.p.A.

Infrastructural department Legal S.O.

Via Sacchi 3

10125 TORINO

J.V.: SALCEF S.p.A. (Group leader), CLF SpA (part)

Object: works for reparation to the superstructure, following the flood of October 2000 on the lines Chivasso-Aosta, Chivasso-Casale, Valenza-Vercelli and Asti-Mortara.

Award amount € 2.614.016 

Period of execution: 2001/2002

 

ITALFERR SpA

Via Marsala 53/67

ROMA

J.V.: CIET SpA (Group leader), CLF (part)

Object: Works for superstructure and TE for the link Olmatello-Osmannoro between the crossroad Olmatello and the polifunctional plant of Osmannoro and works for the crossroad Olmatello, and civil works.

Award amount € 2.877.281,00

Period of execution: 2001/2002

 

Independent Province of Trento

Via Gazzoletti 33

38100 Trento

J.V.: C.C.C.  (Group leader) - CLF, DE ALOE COSTRUZIONI, PASQUAZZO (parts)

Object: works for the goods railway station  of Trento Roncafort, public  station F.S. and new entering track.

Award amount €10.736.903,00

Period of execution: 2001/2003

 

Ferrovie dello Stato S.p.A.

Infrastructural department

North-West Territorial Area

P.zza S. Freud 1

20154 Milano

J.V.: AR.FER. S.r.l. (Group leader) - CLF Spa (part)

Object: rebuilding of the platform plan of some sections on the lines Alessandria-Piacenza,  Bressana-Broni, and Cremona-Fidenza using the worksite train P.M. 150 given by F.S. S.p.A.

Award amount € 2.693.888,00

Period of execution: 2001/2002

 

ITALFERR SpA

Via Marsala 53/67

ROMA

J.V.: CLF (Group leader) - C.C.C., Impr. Bonaventura (Parts)

Object: Works for superstructure and electric traction  from Piazzale Ovest to Borgo Panigale (e) with civil works in Bologna Piazzale Ovest and lengthening of the underground of Via Zanardi and its services.

Award amount € 6.852.516,00

Period of execution: 2002/2003

 

ITALFERR SpA

Via Marsala 53/67

Roma

J.V.: CLF (Group leader) - Unieco, CIET, Impr.Pasolini Impr Bonaventura (parts)

Object: Works for earth, walls, superstructure and electric traction for the quadruplicating between  the stations of Corticella and Castelmaggiore, adequation of the iron plan, and of the platforms. Building of two undergrounds with elevators, platform shelters  and light plants in the stations of Corticella and Castelmaggiore. It has been done also a new passenger building  to Castelmaggiore and the new junction with Cogefrin.

Award amount € 12.163.303

Period of execution: 2001/2003

 

A.C.T.

Viale Trento Trieste, 11

REGGIO EMILIA

Object: maintenance works of superstructure in the railway and rebuilding of some level crossings in the province of Reggio Emilia.

Award amount € 576.890,00

Period of execution: 2000/2001

 

Ferrovie dello Stato S.p.A.

Infrastructural department

North-West Territorial Area

Legal structure organization of Genova

P.zza Acquaverde 5 Genova

J.V.: Valditerra Lavori Ferroviari (Group leader) – CLF (part)

Object: works and supplies for systematically superstructure maintenance  on lines and plants under jurisdiction  of Territorial Unit Genova Lines  for  years 2000 and 2001

Award amount € 2.045.170

Period of execution: 2000/2001

 

Consorzio Fernord

Via Clauzetto 12

Roma

Object: works for the given railway line Roma-Prima Porta

Award amount € 1.201.279,00

Period of execution:2001/2002

 

Ferrovie dello Stato SpA

Infrastructural Department

North - Central Territorial area

Via d'Azeglio 38 

Bologna

J.V.: CLF (Group leader) - Valditerra Lavori Ferroviari (part)

Object: Works for whole substitution of sleepers FS U 35 P with ballast cleaning at the same time, on the railway section Castelguelfo(i)-Cadeo(i) left and right track,  on the line Bologna-Piacenza.

Award amount € 10.346.982,00

Period of execution: 2000/2002

 

Ferrovie dello Stato S.p.A.

Infrastructural Department

Territory area North-central Italy

Via d'Azeglio 38 

Bologna

J.V.:: Impr. Pasolini (Group leader) – CLF (part)

Object: Works for track lowering with ballast cleaning and platform lowering on some sections  on the railway line Bologna-Pistoia.

Award amount € 4.350.788,00

Period of execution: 2000/2001

 

Ferrovie dello Stato S.p.A. 

Infrastructural Department

Territory area North-central Italy

Via D'Azeglio, 38

BOLOGNA

J.V.: C.L.F.  (Group leader) -  Impr. Pasolini (part)

Object: Works for renewing track with ballast cleaning at the same tie on the railway section Russi- Ravenna  on the line Castelbolognese-Ravenna and Crevalcore-Nogara on the line Bologna-Verona.

Award amount € 4.224.578

Period of execution: 2000/2001

 

Ferrovie dello Stato S.p.A.

Infrastructural department

Organisational legal structure

Department of Torino

Via Sacchi 3

Torino

J.V.: C.L.F. S.p.A. (Group Leader) – AR.FER (Part)

Object: works for systematic maintenance for superstructure, with mechanical means for track and turnouts on railway lines and plants under jurisdiction of Territory Infrastructural Department Torino Nodo  to  be made in the period 2000/2001, and works for whole renewing with ballast cleaning at the same time for tracks for locomotives circulation - lines B and C between stations of Torino P.N. (e) and Torino Sm.to (e).Supply and transport of prestressed-concrete sleepers  FS V 35 P with 1° level fastening.
Award amount € 1.783.011,00

Period of execution: 2000/2002

 

Ferrovie dello Stato S.p.A.

Infrastructural department

Organisational legal structure

Department of Torino

Via Sacchi, 3

TORINO

J.V.: C.L.F. S.p.A. (Group Leader) – AR.FER (Part)

Object: works for systematic maintenance for superstructure, with mechanical means for track and turnouts on railway lines and plants under jurisdiction of Territory Infrastructural Department NORD EST LINES to  be made in the period 2000/2001, and works of total replacement of barriers with ballast cleaning at the same time for tracks and substitution of railway between km 109+300 and 112+000 stretch Novara – Trecate, and replacement works of about n. 70 points switch with ballast cleaning at the same time in some stations Torino – Trecate stretch; Supply and transport of prestressed-concrete sleepers  FS V 35 P with 1° level fastening.

Award amount € 2.519.804,00

Period of execution : 2000/2002

 

Ferrovie dello Stato S.p.A.

Infrastructural department Territory area North Central Italy - Legal/Contracts

P.zza dell'Unità Italiana 1

FIRENZE

Object: works for replacement of bad sleepers with F.S.V. 35 P ones, supply by the contractor in some sections of the railway line Grosseto-Pisa.

Award amount € 2.817.560,00

Period of execution: 2002/2003

 

ITALFERR S.p.A

Via Marsala 53/67 

ROMA

J.V.: CLF (group leader) – CIET (part)

Object: works for superstructure and electric traction for the overall development plan's realization  in the station of Montalto di Castro for track correcting on the south side. Ending of P.R.G. in the station of Chiarone, with putting in work of communications right/left and new PRG of Orbetello as foreseen by the new A.C.E.I. plant. Works for I.S., T.T., L.F.M.

Award amount € 2.160.354,00

Period of execution: 2000/2001

 

CO.TRA.L.

Via Volturno 65

ROMA

Object: Ordinary and extraordinary maintenance works with ballast supply and put in work of glued junctions. Extraction of grass from the city railway  of Roma Line "A".

Award amount € 1.079.953,00

Period of execution: 2000/2001

 

Ferrovie dello Stato S.p.A.

Legal Management North - Central Italy

Via M.D'Azeglio, 38

Bologna

Object: works for whole sleepers replacement with ballast rebuilding on the railway line Cintura Nodo of Bologna.

Award amount € 1.536.342,00)

Period of execution: 2000

 

Ferrovie dello Stato S.p.A. 

Legal Territory Management North - Central Italy

Via M.D'Azeglio, 38

Bologna

J.V.: Bonciani Srl (Group Leader) -  C.A.T. Spa and C.L.F. Spa (parts)

Object: Works execution for putting in work the railway line Russi- Ravenna 

Award amount € 5.839.250

Period of execution: 1999/2002

 

Ferrovie dello Stato S.p.A.

Infrastructure Division - Legal - Contracts

P.zza della Croce Rossa 1

ROMA

J.V.: CLF SpA (Group Leader), Arfer Srl, Impresa Pasolini C.Alberto & C. Srl Valditerra Lavori Ferroviari SpA, Coopsette Scrl, Ipa Ferroviaria SpA (parts)

Object: Works for renewing  of line sections of the network FS Lot B.

Award amount € 74.192.616,00

Period of execution: 1999/2002

 

Ferrovie dello Stato S.p.A. 

Infrastructural Division - North East Territory Zone

Piazza Stazione, 3

BOLZANO

Object: Works execution for new reference points in track geometry by fixed marks in the section between Fortezza (i) and Rio di Pusteria (e)  on the line Fortezza - S.Candido

Award amount € 36.160,53  

Period of execution: 2000/2001

 

Ferrovie dello Stato S.p.A.

Legal Territory Office, Central North Italy

Via M.D'Azeglio 38
Bologna

J.V.: CLF SpA (Group Leader), Pasolini C.Alberto & C. Srl (part)

Object: Works execution for systematic maintenance to the superstructure on lines in jurisdiction of Production Service of Bologna in the period from 1/1/1999 to  31/12/2001

Award amount € 3.873.426,74

Period of execution: 1999/2001

 

Consorzio Condofer 

Via Salaria 1039

ROMA

Object: Works for the railway line Bologna-Verona.

Award amount: € 24.216.380,60

Period of execution: 1999/2002

 

Ferrovie dello Stato S.p.A.,

Legal Management, Legal Territorial Garrison

P.zza S.Freud 1
Milano

Object: works for turnouts levelling and short sections in jurisdiction of work plants of Milano P.G., Milano Certosa, Milano Greco, Rho, Busto Arsizio, Gallarate, Sesto C., Arona, Premosello, Domodossola, Luino, Varese, Monza, Como, Carnate, Calolziocorte, Lecco, Colico, Sondrio and levelling of sections Baveno-Domodossola, Monza-Chiasso, Gallarate-Pino T, Carnate-Tirano, Calolzio Corte Ponte S.Pietro, Carnate-Bergamo, Monza-Molteno, Lecco-Albate, Colico-Chiavenna and superstructure works for equalization of signalling and electrification  plants in the station Domo 2 on the line Arona-Domodossola.

Award amount € 1.068.291,10  

Period of execution: 1999/2001

 

A.C.T. Reggio Emilia

Viale Trento Trieste 11

42100 Reggio Emilia

Object: work execution for  maintenance to the track  on the lines Sassuolo - Guastalla, and Reggio Emilia - Ciano d'Enza

Award amount: € 649.993,16

Period of execution: 1999/2000

 
ITALFERR S.p.A. 
Via Marsala, 53/67

ROMA

J.v.: Bonciani (Group Leader), CLF, ACMAR (parts)

Object: Work execution for rehabilitation to P.R.G. in Rimini Station for building new ACEI with modification to the superstructure, supply of ballast, equalization for the contact line, lengthening for two platforms, and modification for the take out snow turnouts plant.

Award amount € 1.517.472,26

Period of execution: 1998/2001

 

Ferrovie dello Stato S.p.A.

Legal Territorial Garrison

P.zza Acquaverde 5, 

GENOVA

Object: renewal works with ballast cleaning at the same time, on the section from Ronco S.Bivio Succursale right track of the line Milano-Genova Succursale dei Giovi, using equipment with high performances (renewal train, draining machine, fire welding machine).

Award amount € 3.834.728,58  

Period of execution: 1999/2001

 

Ferrovie dello Stato S.p.A. 

Legal Territorial Garrison

P.zza Acquaverde 5, 

GENOVA

Object: Works for track renewal and ballast rebuilding, to be done on the section Ronco S.(i)-Arquata S.(i), right and left track of section Milano-Genova directly by Ronco S.-Arquata S., using high performing equipments.

Award amount € 3.269.433,99

Period of execution: 1998/2000

 

Ferrovie dello Stato S.p.A. 

P.zza Acquaverde 5, 

GENOVA

Object: works for systematically superstructure maintenance about lines of Production Office of Genova Levante, project and building of reference points of curves and regularization of  inside tensions of long welded rail to be done on some lines under  jurisdiction of production service of Genova.

Award amount € 991.597,25

Period of execution: 1998/1999

 

RETE FERROVIARIA ITALIANA S.p.A.

Operative Sector of Genova

Piazza Acquaverde, 5

16126 GENOVA

J.V.: Valditerra S.p.A (Group Leader), G.C.F. S.p.A., AR.FER S.r.l., C.L.F. S.p.A. (Parts).

Object: Superstructure systematic maintenance works in the three years 2009-2011, included works for supplementary maintenance and modifications of superstructure locations inside the jurisdictional lines of the Territorial Unit of Genova Lines and of the Territorial Unit of Genova District in the Compartmental and Infrastructural Direction of Genova.

Award Amount:  € 8.609.539,77

Period of execution: 2009-2011

 

METRO S.p.A.

Via Tiburtina, 770

00159 Roma

J.V.: SALCEF S.p.A. (Group Leader), C.L.F. S.p.A. (Part).

Object: Superstructure ordinary and extraordinary maintenance works in the railway section Castelnuovo –Viterbo of the Regional railroad RM-VT.

Award Amount: € 2.857.533,68

Period of execution: 2009-2012

 

METRO C S.p.A.

Via Torre Spaccata, 172

00169 Roma

Object: Placing on the ballast of superstructure work for the section granite depot T7, and T6A and on the section T6A, T5 and T4.

Award Amount: € 9.170.325,20

Period of execution: 2009-2012

 

RETE FERROVIARIA ITALIANA S.p.A.

Via Matteotti, 5

40129 Bologna

Object: Construction of the bridge on the Po River and static testing.

Award Amount: € 61.546,54

Period of execution: 2009

 

RETE FERROVIARIA ITALIANA S.p.A.

Piazzetta Cairoli, 5

90133 Palermo

Object: putting on hand of two special trains and the relative staff for the load tests on some structure of the new double track railway section Pace del Mela-Rometta of the line Palermo-Messina.

Award Amount: € 375.907,98

Period of execution: 2009

 

ITALFERR S.p.A.

Via Marsala 53/67

00185 ROMA

A.T.I.: C.L.F. S.p.A. (Group Leader) – S.I.F.EL. S.p.A. (Part)

Object: Superstructure works, electric traction of new tunnels under the Bologna District of the High Speed Station and of the section between the High Speed Station and the km. 4+000 of the high speed line Bologna-Milano, and the High Speed interconnection with the line BO-VR and BO-PD for the demolition of the bridge that connects the San Ruffillo Station and the fan of sidings of the adjacent worksite of Via Corelli in Bologna.

Award Amount: € 19.043.398,85

Period of execution: 2010-2012

 

ITALFERR S.p.A.

Via Marsala 53/67

00185 ROMA

Participation: Stable Consortium Eureca

Object: Activities of infrastructural track reinforcement of Genova Voltri – Genova Brignole in the railways district of Genova.

Award Amount: € 272.871.948,08  

Period of execution: 2010-2016

 

RETE FERROVIARIA ITALIANA S.p.A.

Legal Management – Legal Milano

Via Breda, 28

20125 MILANO

J.V.: GEFER S.p.A. (Group Leader), C.L.F. S.p.A., Valsecchi S.r.l., Acmer S.r.l. (Parts)

Object: Superstructure railways maintenance works during the years 2009-2010-2011 on the RFI Line within the territorial production direction of Milano, and works for supplementary maintenance or modifications of superstructure locations included supply of sleepers, little materials and ballast.

Award Amount: € 21.397.000,00

Period of execution: 2009-2011